Distribution Assets Life Cycle Management Interest Group - Current Projects
• Assessment of the Effects of Road Authority Chemicals and Substances on Insulators, Fiberglass Components, and Concrete Poles
• Demonstration of an Advanced Protection Scheme for a Secondary Network System, Phase II
• Remedial Treatment of Utility Poles Using Borate Rods and In-Situ Butt Encapsulation, Phase II
• Development of an Application Guide Related to Project 5061
• Tutorial for Analysis Functions of the Deficiency Ranking Method for Distribution Systems
• Engineering Guide for Distribution Overcurrent Protection
• CSA Standards for Polymer Cutouts
• Replacement/EOL Criteria for Distribution System Assets
• Utility Guide to Forensic Root Cause Analysis of Distribution Failure
• Cost of Reliability Methodologies
• Limits for the Connection of Distributed Generation to the Distribution System
• Non-Destructive Condition Assessment of ACSR Distribution Conductors, Phase 2
• A Roadmap of Anticipated Customer Load
• Deficiency Ranking Method for Distribution System Inspections
• State-of-the-Art Capacitance Meter Comparison
• State-of-the-Art Portable Mega-Ohm Meter Evaluation and Comparison
• Worker Protection on De-Energized Distribution Lines
• State of the Art Assessment of Requirements for Attachment of Wi-Fi Equipment to Electric Utility Facilities
• Effects of Demand Side Management/TOD Rates on Load and Loss Factors
• Web Based Distribution Fault Locator
• Arc Flash on a Utility System
• State-of-the-Art Review of Management of Technical and Non-Technical Losses in Distribution Systems
• Smart Grid Task Force