Objective:
The CEATI Penstock Task Force will provide a platform for best practices and technical exchange as well as identify, review, evaluate and pursue potential R&D areas.

Discussion Topics / Potential Work Areas

  • Corrosion Guidance
  • Penstock Inspection Scoping (including NDE guidance, steeply inclined to vertical penstocks)
  • Instrumentation Guidance
  • Repairs and Mitigation Guidelines
  • Maintenance Procedures and Frequencies
  • Seismic and Structural Upgrades Guidelines (including how to justify budget for these)
  • Geotechnical Best Practices for Penstock Back-slopes and Foundations
  • Guidance for Determining Remaining Life of Penstocks and Acceptable Operating Risk
  • Development of a Model Penstock Safety Program
  • Expansion Joints
  • New or Alternative Materials (based on economic analyses and experience)
  • Potential Failure Modes Guidelines for the various types of water conveyances

Upcoming Events:
CEATI International’s Dam Safety Interest Group (DSIG) and Hydraulic Plant Life Interest Group (HPLIG) are hosting an industry symposium entitled “Penstock Symposium: Learning from International Best Practices, Incidents and Failures”.
March 14, 2012 – Santa Monica, CA

The Symposium Will Feature Presentations on the Following Themes:

  • Technical / Engineering Approaches to Maintaining Penstock Reliability
  • Asset Investment Planning
  • Case Studies
  • Panel Discussion

Who Should Attend?

  • Engineering Managers
  • Dam Safety Managers
  • Asset Managers
  • Plant Managers
  • Water Managers
  • Dam Safety Regulators
  • Civil/ Structural/ Mechanical/ Electrical Engineers
  • Maintenance Supervisors
  • Operations Supervisors
  • System Planners/ Operators
  • Manufacturers/ Suppliers
  • Consultants
  • Project Managers
  • Service Contractors

For additional information or to register for this workshop please visit: http://www.ceati.com/Meetings/HYDRO2012/