Logo
Participant Login

Invitations for Proposals

Please also see our

Customer Energy Solutions Interest Group  (CESIG):
IFP CESIG.12.01 Best Practices Guide for Measurement and Verification of Demand Response
IFP CESIG.12.02 Motor Efficiency Estimating Tool for AC Three Phase Induction Motors based on Uncoupled Motor Testing
IFP CESIG.12.03 Utilities Guide to Plug Load Proliferation in Residential Markets

Please submit your proposals before 4 PM EST, Thursday, January 26th, 2012, at the following website:

CEATI Proposal Submissions


Strategic Options for Sustainable Power Generation Interest Group (SOIG):
IFP SOIG.12.01 Assessment of the Potential for Hydrokinetic Technologies

Please submit your proposals before 4 PM EST, Thursday, February 2, 2012, at the following website:

CEATI Proposal Submissions


Overhead Line Design Issues & Wind and Ice Storm Mitigation Interest Group (WISMIG):
WISMIG IFP 3385 Guide for Determining Deflection Criteria
WISMIG IFP 3386 Corrosion Assessment of Tubular Steel Poles
WISMIG IFP 3387 Transmission Line Monitoring Package for Extreme Events
WISMIG IFP 3388 Guide for the Design, Installation, and Repair of ACSR Conductor Splices
WISMIG IFP 3389 Application Guide for Wind Speed-Up Factors

DEADLINE EXTENDED: Please submit your proposals before 4 PM EST, Friday, February 17, 2012, at the following website:

CEATI Proposal Submissions


Transmission Underground Cables Interest Group (TUCIG):

TUCIG IFP 12.01 Spare Part Strategy for Transmission Cable Systems
TUCIG IFP 12.02 Real Time Thermal Rating for Underground Cable Systems

Please submit your proposals before 4 PM EST, Thursday, February 16, 2012, at the following website:


Additional links: