Logo
Participant Login

Invitations for Proposals

 

Please also see our
 

Grounding and Lightning Protection Task Force (GLTF):
IFP GLTF.12.01 Grounding Practices for Concrete Poles
IFP GLTF.12.02 Realistic Corrosion Test of Buried Grounding Connectors
IFP GLTF.12.03 Performance Review of gradient Control Mats
IFP GLTF.12.04 Comparison of CSA, IEEE, and IEC Approach to Lightning Protection
RFP GLTF.12.05 Grounding Practices for Concrete Poles

Please submit your proposals before 4 PM EST, Thursday, June 14, 2012, at the following website:

CEATI Proposal Submissions

 


Distribution Assets Life Cycle Management (DALCM) Interest Group:
DALCM IFP 12.02 Tools and Data Needs for Micro Generator Screening
DALCM IFP 6002 Corrosion on the Distribution System: Mitigation Strategies

Please submit your proposals before 4 PM EST, Thursday, June 7, 2012, at the following website:

CEATI Proposal Submissions

 


Water Management Interest Group (WMIG):

Please submit your proposals before 4 PM EST, Thursday, May 10, 2012, at the following website:

CEATI Proposal Submissions

 


Thermal Generation Interest Group (TGIG):
IFP TGIG.12.01 Impacts of Cycling/Two Shift Damage on the O&M Cost and Reliability of Natural Gas-Fired Combined Cycle (NGCC) Power Plants

Please submit your proposals before 4 PM EST, Thursday, March 29, 2012, at the following website:

CEATI Proposal Submissions


Additional links:

 

SVP aussi voir



Overhead Line Design Issues & Wind and Ice Storm Mitigation Interest Group (WISMIG):

WISMIG IFP 3385 Guide for Determining Deflection Criteria
WISMIG IFP 3386 Corrosion Assessment of Tubular Steel Poles
WISMIG IFP 3387 Transmission Line Monitoring Package for Extreme Events
WISMIG IFP 3388 Guide for the Design, Installation, and Repair of ACSR Conductor Splices
WISMIG IFP 3389 Application Guide for Wind Speed-Up Factors

SVP soumettre vos propositions avant 16h EST, jeudi, le 9 février, 2012 au site suivant:

CEATI Soumission de propositions


Transmission Underground Cables Interest Group (TUCIG):

TUCIG IFP 12.01 Spare Part Strategy for Transmission Cable Systems
TUCIG IFP 12.02 Real Time Thermal Rating for Underground Cable Systems

Please submit your proposals before 4 PM EST, Thursday, February 16, 2012, at the following website:


Liens supplémentaire: