CEATI has over 150 projects underway at any given time. Below is a list of completed projects developed for Electrical Utilities.

Keywords / Number    
T163700 3720
Methodology for Lightning Performance Improvement
T133700 3708
Performance Review of Gradient Control Mats
T163700 3718
Ensuring the integrity of Working Ground Connection Points in Stations
T153700 3716
Personal Protection Grounding Reference Guide
T143700 3713
Best Practices in Rehabilitating Deficient Grounding Grid Performance
T144700 50/121
Bonding of Telecommunications Sheath/Messenger to the Power Neutral
T143700 3710
Review of Distribution System Grounding Practices and Rules
T143700 3711
Investigation of Effective Ground Impedance Measurement to Mitigate Distribution System Operating Parameters
T143700 3259
Guide for Condition Assessment of Lightning Arresters Installed on Transmission Lines
T143700 3712
Substation Grounding Design Review Spreadsheet
T133700 3709
Comparison of CSA, IEEE and IEC Approach to Lightning Protection
T143700 3714 A
Application of Geology and Geochemistry to Locating Optimal Substation Grounding Sites
T133700 3707
Recommended Grounding Practices: Determine Causal Factors of and Resolve Bolt Failures in Concrete Poles
T113700 3703
Evaluation and Comparison of Grounding Test Equipment
T123700 3706
Power Connections for Grounding Systems
T113700 3702
Soil Resistivity Testing
T123700 3704
Grounding System Risk in Design, Construction and Testing a New Grounding System
T123700 3705B
Grounding System Health Index Methodology
T123700 3705A
Grounding System Maintenance Guide
061 T512
Forecasting of Damaging Lightning Strokes By Radar Observations