CEATI has over 150 projects underway at any given time. Below is a list of completed projects developed for Electrical Utilities.

Keywords / Number    
T153700 3715A
Minimum Separation Between Underground Pipelines and Electric Utility Grounding Systems - Specification and Modeling
T163700 3902
Guide for IEC 61850 Standard Applications
T173700 30/120
Understanding the Key Factors, Weightings & Prioritization Factors of Health Indices
T183700 3422
Review of CEATI Health Index Rating and Weighting System
T173700 3723
Rating and Placement of Working Grounds
T183700 3277
TR: Infrared Transmission Line Inspection Guide
T173700 30/116
TR: Guide to Risk Management for Station Equipment and Apparatus
T173700 30/118
Best Practices in in Station Equipment Commission Testing
T183700 30/107B
Guide for Asset Replacement Strategies with an Asset Management Plan Leveraging a Risk Based Approach - Phase II
T192700 0244
Methodology for Analysing and Managing Floating Debris at Dams and Reservoirs
T173700 4102
Control of weeds in electrical facilities such as substations, switchyards, capacitor stations, and cable termination sites
T173700 30/121
Systematic Approach to Evaluate and Compare Asset Renewal and Capacity Upgrade Projects
T153700 3420
HPFF Joint Casings Corrosion Protection Aging Test
T153700 3717
Soil Resistivity Testing - Phase 2A
T173700 30/119
Guide to Developing Utility Asset Management Plans for Each Asset
T174700 50/118B
Distribution System Health Indices: A Simplified Methodology
T182700 0234B
Dam Safety Maturity Matrices Version 2
T173700 33114
Guidelines for Optical Ground Wire Technology
T183700 3278
TR: Condition Assessment of Overhead Transmission Line Steel Lattice Towers
T182700 0146
Maintenance Optimization Using Risk-Based Tools