CEATI has over 150 projects underway at any given time. Below is a list of completed projects developed for Electrical Utilities.

Keywords / Number    
T162700 0393
Hydraulic Generating Station Penstock Maintenance and Repair Reference Manual
T162700 0541-2
Microgrid Scoping Study Volume II - Additional Tasks
T164700 3805
Example Roadmaps for Improving Maturity of DER Management at Distribution Utilities
T163700 3265
Transmission Line Switch Maintenance Strategies and Maintenance Requirements
T162700 0143
Generator Maintenance and Condition Assessment Guide
T173700 3272
TR: Guidelines for Managing Transmission Line Clearances
T182700 0431
Technology Review: Hydropower Training Project
T174700 5176
Guide for Variable Frequency Drive Installations
T153700 3264
Formulating Health and Condition Indices for Transmission Lines
T173700 3273
TR: Guidelines for Transmission Line Pole and Tower Steel Capacity based on Corrosion Degradation
T184700 50/147
Evaluation Of Online Monitoring Technologies For Distribution Assets - Technology Watch
T172700 0430
Technology Review: Roadmap for Applied Statistical Analysis Techniques for Hydro Generation and Runoff
T163700 3132
Voltage Sensitive Load Loss: Guide to Planning Studies and Mitigation Factors
T173700 33118
Fiber Reinforced Polymer (FRP) Composite Lattice Towers
T173700 33113
Understanding and Development of a Database for Line Failures
T173700 30/122
Enhanced Diagnostics and Condition Assessment of LTCs
T163700 30/112
NERC PRC-005 Best Practices for Compliance
T174700 50/144
Testing Based Condition Assessment of Medium Voltage Distribution Cables
T162700 0144
Best Practice Guidelines for the Operation and Maintenance of Steam Condensers and their Auxiliaries
T163700 3508
Key Management