Project: T183700 #30/106B
 

 

•Will consist of leveraging internal expertise and insights gained from the first phase to develop an inventory model prototype for CEATI member utilities’ use. 
•DNV GL will present the comparison and applicability of the various inventory models described in Phase 1 to CEATI to determine which model is most applicable to the members in general.
•The default values and algorithms differ depending on the asset type and location on the electric system. With this in mind, DNV GL will develop a model for two examples chosen by sponsors (e.g. T&D substation transformer and distribution poles).