Inquire about this publication
Project: T153700 #3801B
 

The purpose of Phase 2 is to implement the approach developed in Phase 1 through the creation of a Cost-Benefit Analysis (CBA) model programmed in MS Excel VBA 2010. Prior to the development of the CBA model, a survey was conducted to estimate the capital and O&M costs of deploying Smart Grid technologies which enable various Fault Location Isolation and Service Restoration (FLISR) and Voltage/VAR Optimization (VVO) strategies, as well as to account for the benefits of these applications relative to Business as Usual.

Keywords:

Cost-Benefit Analysis, Fault Location Isolation and Service Restoration, Smart Distribution Technologies, Smart Grid Applications, Voltage/Var Optimization