Inquire about this publication
Project: #EG910012/2
 

A six-year field program was undertaken to measure ice loads on hydro-electric structures. The loads on one pier and gate of the Paugan dam, and on steel and wooden stoplogs at the Seven Sisters dam were measured. Methods were developed to predict the ice loads.